MétaCan
Menu
Back to cohort
Record W2064102763 · doi:10.2118/163922-ms

Zone Abandonment with E-Line Inflatable Bridge Plug Provides Work-Around for Platform with Coiled-Tubing Access Limitations

2013· article· en· W2064102763 on OpenAlexaboutno aff
Alejandro Osorio, R.E. Frisby

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicDrilling and Well Engineering
Canadian institutionsnot available
Fundersnot available
KeywordsInflatableCoiled tubingSpark plugWirelineBridge (graph theory)GeologyEngineeringTractorMechanical engineeringPetroleum engineeringTelecommunications

Abstract

fetched live from OpenAlex

Abstract An operator working in the North Atlantic off the coast of Newfoundland, Canada required a downhole barrier to permanently abandon a set of depleted perforations. Platform limitations restricted the use of traditional methods to abandon the zone located in a nearly horizontal lateral well. The operator elected to set a high expansion inflatable bridge plug on wireline in a highly deviated section and spot cement on top of it to abandon the zone. There were several challenges involved in this application including the requirement for the bridge plug to expand by more than 200% of its run-in diameter due to wellbore restrictions and deviation. E-line was required to provide power for the wireline tractor because a coiled tubing unit could not access the well slot due to the positioning of the rig on the platform. Additionally, the bridge plug had to withstand a 3,000 psi differential pressure test and hold for several weeks without the aid of cement until coiled tubing could be deployed to place cement on top. The plug was successfully set and held the required pressure. Three weeks after, the platform derrick was moved to another slot and coiled tubing access was again available. The plug was again tested to 3,000 psi and cement was placed on top of it to establish a permanent barrier. A high expansion inflatable bridge plug setting system run in conjunction with a wireline tractor provided an optimal solution for this application. Using this inflatable bridge plug setting system in conjunction with a wireline tractor represented substantial savings in rig time and operational costs. The operator was able to perform all necessary integrity tests to confirm hydraulic isolation and successfully abandon the zone. The bridge plug deployment system is capable of pumping downhole wellbore fluids to set the plug without a coiled tubing unit or pumps on location. E-line was used to support the tractor through high deviation however; the bridge plug deployment system can alternatively be deployed on slick-line or with a coiled tubing tractor.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.004
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.009
Threshold uncertainty score0.031

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.004
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.000
Science and technology studies0.0010.001
Scholarly communication0.0010.002
Open science0.0020.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0090.004

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.038
GPT teacher head0.216
Teacher spread0.178 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2013
Admission routes1
Has abstractyes

Explore more

Same topicDrilling and Well EngineeringFrench-language works237,207