Rapid Pier Delivery Using Precast Concrete Components

2010· article· en· W2066517487 on OpenAlexaff
Charles N. Rosner, Tom Shafer, Ron Byres

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsVancouver Coastal Health
Fundersnot available
KeywordsPierPrecast concreteEngineeringScheduleCivil engineeringComputer science

Abstract

fetched live from OpenAlex

In July 2008, a new pier for offloading coal was commissioned at the Morgantown Power Generation Plant in Maryland, on the US eastern seaboard. The new pier, measuring 495 ft long x 54.5 ft wide, is designed to support a coal unloading machine capable of handling barges up to 20,000 DWT. Contractual arrangements with the coal supplier dictated the need to have the pier ready for operation by July 2008, only 10 months after initiation of the pier design. Permitting revisions, supplemental site investigations, full design of the pier and conveyor foundations, and the construction of the entire pier and conveyor system had to be accomplished within this very tight schedule. To accelerate the project delivery, a modified design/build approach was utilized wherein the design consultants worked closely with the constructor to develop a structural scheme that could be procured, fabricated, and erected within a highly compressed timeframe. The design solution was a unique modular precast concrete structure that minimized the amount of cast-in-place concrete work. This approach allowed the fabrication of precast units offsite, which could then be assembled rapidly onsite once the piles were driven. Critical path elements such as piles and crane rails were pre-ordered, while design of the remaining components was still underway. One unusual challenge overcome for this project was developing a connection detail to allow precast concrete pilecaps to be used with hollow prestressed concrete batter piles. This innovative approach to the design and detailing facilitated construction in winter weather and significantly shortened the construction schedule. This $46M project was successfully completed within schedule and budget, and the first barge was unloaded in July 2008 as per contractual obligations. The project subsequently won a local award from the American Council of Engineering Companies.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesInsufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.804
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.018
GPT teacher head0.200
Teacher spread0.182 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations3
Published2010
Admission routes1
Has abstractyes

Explore more

Same topicBIM and Construction IntegrationFrench-language works237,207