Bibliographic record
Abstract
Abstract Every year oil and gas fields play out their useful economic life. Once production ceases, the facilities are often suspended awaiting their ultimate fate. In this time lag, until the sites are decommissioned and remediated, much will deteriorate. Also, during this period, infrastructure in remote regions often departs south, leaving the environmental project with a wide range of challenges that are not encountered in less remote areas. Any decommissioning project can have many safety hazards. In a remote project, these hazards are magnified because of the difficulty in getting resources or emergency aid. For example, the discovery of asbestos can endanger unprepared workers; it can delay the project while qualified contractors are retained and it will increase costs. For a remote site, the solution is to plan, plan and plan for both the expected and a contingency plan for the unexpected. The first step in planning the project is to complete a hazard assessment.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.003 |
| Meta-epidemiology (narrow) | 0.001 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.001 |
| Bibliometrics | 0.001 | 0.000 |
| Science and technology studies | 0.002 | 0.001 |
| Scholarly communication | 0.001 | 0.001 |
| Open science | 0.001 | 0.002 |
| Research integrity | 0.001 | 0.001 |
| Insufficient payload (model declined to judge) | 0.014 | 0.002 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".