MétaCan
Menu
Back to cohort
Record W2102242875 · doi:10.1109/wsc.2002.1166454

Optimal construction project planning

2003· article· en· W2102242875 on OpenAlexaff
Simaan AbouRizk, Yasser Mohamed

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of Alberta
Fundersnot available
KeywordsConstruction industryComponent (thermodynamics)Computer scienceWork (physics)Pre-construction servicesSystems engineeringConstruction managementProduction (economics)Project planningEngineering managementConstruction engineeringProcess managementProject managementEngineering

Abstract

fetched live from OpenAlex

The nature of the construction industry combined with the lack of appropriate techniques and technologies suitable for construction work are among the main reasons for inadequate industry performance. Researchers need to develop a better understanding of the construction industry and develop approaches and technologies that will enable construction companies to do a better job in estimating, planning, and control. A production-based framework is proposed in this paper to address some of the challenges in managing construction projects. The framework is based on a number of components, which collectively represent an integrated approach for planning and execution of construction projects. This paper focuses on the simulation component of the framework and highlights the features currently available in Simphony as a leading construction simulation platform. It also addresses the main challenges and requirements for extending its capabilities to fit within the envisioned framework.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.777
Threshold uncertainty score0.251

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.226
Teacher spread0.213 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations28
Published2003
Admission routes1
Has abstractyes

Explore more

Same topicBIM and Construction IntegrationFrench-language works237,207