MétaCan
Menu
Back to cohort
Record W2102294353 · doi:10.1109/ccece.2003.1226469

Impact of equipment availability on composite system reliability

2004· article· en· W2102294353 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.
aboutThe title or abstract carries a Canadian signal from the geographic lexicon.

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicPower System Reliability and Maintenance
Canadian institutionsUniversity of Saskatchewan
Fundersnot available
KeywordsReliability engineeringReliability (semiconductor)Electric power systemTransmission systemProbabilistic logicMonte Carlo methodElectricityElectricity generationComputer scienceTransmission (telecommunications)Mains electricityElectric power transmissionComponent (thermodynamics)Function (biology)EngineeringPower (physics)Electrical engineeringTelecommunicationsVoltage

Abstract

fetched live from OpenAlex

The reliability of supply in a bulk electricity system is directly related to the availability of the generation and transmission facilities. In a conventional vertically integrated system these facilities are usually owned and operated by a single company. In the new deregulated utility environment, these facilities could be owned and operated by a number of independent organizations. In this case, the overall system reliability is the responsibility of an independent system operator (ISO). Composite system reliability evaluation involves the analysis of the combined generation and transmission system in regard to its ability to serve the system load. The load point reliabilities are a function of the capacities and availabilities of the generation and transmission facilities and the system topology. In Canada, availability data on generation and transmission facilities are collected by individual electric power utilities and disseminated by the Canadian Electrical Association. Accurate and consistent collection of data is an important function in a modern power system and a vital component in a probabilistic approach to system development and growth. This paper examines the effect of equipment availability on the load point and system reliability of two test systems using a Monte Carlo simulation approach. The paper shows that the availabilities of specific generation and transmission facilities have major impacts on the load point and system reliabilities. These impacts are not uniform throughout the system and are highly dependent on the overall system topology and the operational philosophy of the system.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.900
Threshold uncertainty score0.583

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.227
Teacher spread0.219 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Quick stats

Citations10
Published2004
Admission routes2
Has abstractyes

Explore more

Same topicPower System Reliability and MaintenanceFrench-language works237,207