MétaCan
Menu
Back to cohort
Record W2116340790 · doi:10.1061/41109(373)3

Resource Performance Indicators in Controlling Industrial Steel Projects

2010· article· en· W2116340790 on OpenAlexaff
Reza Azimi, Sang Hyun Lee, Simaan AbouRizk

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of Alberta
Fundersnot available
KeywordsResource (disambiguation)Systems engineeringPerformance indicatorComputer scienceControl (management)Process (computing)Markov chainEngineeringIndustrial engineeringBusiness

Abstract

fetched live from OpenAlex

Industrial steel construction deals with the design, fabrication, and site erection of steel elements and encompasses many activities, interactions, and potential resources. An effective project control system for such an environment, as well as issues concerning traditional control systems, are important. This has motivated the authors to propose an integrated and real-time monitoring and control system for steel projects. This paper discusses the application of the concept of resource performance indicators in major components of the proposed system that deal with measuring project performance and the simulation of different scenarios. An object model is utilized and a control object is defined for steel projects to ease the control process. The focus of this research is on labour performance indicators in the fabrication phase of industrial steel projects. To improve the accuracy of the outputs of the system, the Markov Chain method has been used to forecast the values of the resource performance indicators that are fed into the simulation model.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.645
Threshold uncertainty score0.224

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.011
GPT teacher head0.192
Teacher spread0.181 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations4
Published2010
Admission routes1
Has abstractyes

Explore more

Same topicBIM and Construction IntegrationFrench-language works237,207