MétaCan
Menu
← Back to cohort
Record W2126624245 · doi:10.1061/9780784413067.103

Rail Trench Structure Design at Port of Vancouver USA

2013· article· en· W2126624245 on OpenAlexaffabout
Howard A. Wells, Brian S. Maxwell, Greg Westrand, Jyotirmoy Sircar

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicGeotechnical Engineering and Underground Structures
Canadian institutionsBerger (Canada)
Fundersnot available
KeywordsTrenchPort (circuit theory)Track (disk drive)TrainBridge (graph theory)Work (physics)Civil engineeringEngineeringGeologyGeographyArchaeology

Abstract

fetched live from OpenAlex

Located at the Port of Vancouver USA, the West Vancouver Freight Access Schedule 2 Rail Project 16 will connect the BNSF north/south mainline track with the Port rail system. The current rail entrance blocks the mainline when unit trains enter or leave the Port. This resulted in the need to develop a new entrance, the only feasible alignment being along the north bank of the Columbia River and beneath the existing BNSF Bridge 9.6. A 1,350-foot (411.5 meters) portion of this track will be carried by a partially elevated reinforced concrete structure that will protect the rail from 100-year flood waters and support it along the irregular river bank. This paper describes the constraints that dictated the design features and the resulting configuration of the partially elevated reinforced concrete structure. To resist flooding and provide the required clearance under the existing rail bridge, a watertight, continuous concrete trench was selected as the preferred solution. Closely spaced batter piles support 1,100 feet (335.3 meters) of the trench and provide lateral resistance to seismic loads and buoyancy resistance. Portions of the rail trench structure will be constructed below the U.S. Army Corps of Engineers' ordinary high water mark of the river and will be subjected to in-water work timing restrictions. The river is home to several species listed under the Endangered Species Act, and the Port has undertaken a very low-impact approach to construction of the rail trench: no work will be conducted in the flowing water of the river. This necessitates careful planning and sequencing of the work, taking into account projected river levels and tidal fluctuations. Other challenges include an extremely constricted site with limited access and the need to minimize impacts on adjacent tenants and their operations. When constructed, the rail trench structure will provide a unique facility designed to meet the latest structural, seismic, and environmental requirements and maximize operational efficiency for the Port.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.114
Threshold uncertainty score0.228

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0010.000
Scholarly communication0.0010.000
Open science0.0010.001
Research integrity0.0010.000
Insufficient payload (model declined to judge)0.0190.004

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.006
GPT teacher head0.172
Teacher spread0.166 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2013
Admission routes2
Has abstractyes

Explore more

Same topicGeotechnical Engineering and Underground Structures→French-language works237,207→