MétaCan
Menu
Back to cohort
Record W2126691367 · doi:10.1109/tr.2010.2056412

An Integrated Model for Production and Preventive Maintenance Planning in Multi-State Systems

2010· article· en· W2126691367 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.
fundA Canadian funder is recorded on the work.

Bibliographic record

VenueIEEE Transactions on Reliability · 2010
Typearticle
Languageen
FieldEngineering
TopicReliability and Maintenance Optimization
Canadian institutionsUniversité Laval
FundersUniversité Laval
KeywordsPreventive maintenanceCorrective maintenanceTime horizonProduction (economics)SizingReliability engineeringOperations researchHolding costState (computer science)EngineeringPlanned maintenanceGenetic algorithmComputer scienceProduction planningTotal costOperations managementMathematical optimizationMathematicsEconomics

Abstract

fetched live from OpenAlex

This paper integrates preventive maintenance with tactical production planning in multi-state systems. The proposed model coordinates the production with the maintenance decisions, so that the total expected cost is minimized. We are given a set of products that must be produced in lots on a multi-state production system during a specified finite planning horizon. Planned preventive maintenance, and unplanned corrective maintenance can be performed on each component of the multi-state system. The maintenance policy suggests cyclical preventive replacements of components, and a minimal repair on failed components. The objective is to determine an integrated lot-sizing and preventive maintenance strategy of the system that will minimize the sum of preventive and corrective maintenance costs, setup costs, holding costs, backorder costs, and production costs, while satisfying the demand for all products over the entire horizon. We model the production system as a multi-state system with binary-states, and <i xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">s</i> -independent components. A method is proposed to evaluate the times and the costs of preventive maintenance and minimal repair, and the average production system capacity in each period. We show how the formulated problem can be solved by comparing the results of several multi-product capacitated lot-sizing problems. For large-size problems, a genetic algorithm is developed to deal with the preventive maintenance selection task in the integrated planning model.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.615
Threshold uncertainty score0.692

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.016
GPT teacher head0.255
Teacher spread0.239 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it