Bibliographic record
Abstract
This paper presents a computer system developed to assist earthmoving contractors in preparing proposals. It can also be used by owners and (or) their agents to plan and estimate the cost and duration of earthmoving projects. This is particularly useful for large projects where owners need to define a feasible scope of work that suits their budgets and operating plans. The system has been developed utilizing computer simulation. This paper provides an overview of the developed system and briefly describes its basic components, focusing primarily on the development of the system's database and the procedure used to account for indirect cost components of this class of projects. The paper also demonstrates the capabilities of the developed system in selecting most-suitable equipment fleets, from available equipment, that meet the terms and conditions outlined in bid documents. A project example is analyzed to demonstrate the essential features of the developed system.Key words: bid preparation, earthmoving, equipment database, indirect cost, computer simulation.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".