A New Approach to Communications Management Planning Through 3D Web and Semantic Web Technologies
Bibliographic record
Abstract
Communication management plans are used to determine not only who needs what information but also how that information will be collected and transmitted. Now two evolving technologies are looking to drive project planners to develop new approaches and methods for planning communications in the coming years. The first of these technologies, the Semantic Web, is becoming a driving force in how computers are making web content available to its users. The second technology, Web three-dimensional (3D) focuses on web-based content presentation by providing a rich 3D Web-centric environment for users to access information and interact with other users. This effort discusses the advent of the Semantic Web and Web 3D technologies and identifies many of the new planning considerations driving project information collection and analysis. The planning considerations for these two technologies are also discussed to aid in the framing of a new approach to project communications planning.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.001 | 0.001 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".