MétaCan
Menu
Back to cohort
Record W2146145652 · doi:10.1109/pvsc.2009.5411247

Optimizing design of household scale hybrid solar photovoltaic + combined heat and power systems for Ontario

2009· preprint· en· W2146145652 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.
aboutThe title or abstract carries a Canadian signal from the geographic lexicon.

Bibliographic record

Venuenot available
Typepreprint
Languageen
FieldEnergy
TopicSolar Thermal and Photovoltaic Systems
Canadian institutionsQueen's University
Fundersnot available
KeywordsPhotovoltaic systemGrid-connected photovoltaic power systemBase load power plantEnvironmental scienceAutomotive engineeringElectric power systemElectricity generationDistributed generationSolar powerEnergy storageStand-alone power systemRenewable energyReliability engineeringElectrical engineeringEngineeringPower (physics)Maximum power point tracking

Abstract

fetched live from OpenAlex

This paper investigates the feasibility of implementing a hybrid solar photovoltaic (PV) + combined heat and power (CHP) and battery bank system for a residential application to generate reliable base load power to the grid in Ontario. Deploying PV on a large-scale has a penetration level threshold due to the inherent power supply intermittency associated with the solar resource. By creating a hybrid PV+CHP system there is potential of increasing the PV penetration level. One year of one second resolution pyranometer data is analyzed for Kingston Ontario to determine the total amount of PV energy generation potential, the rate of change of PV power generation due to intermittent cloud cover, and the daily CHP run time required to supply reliable base load power to the grid using this hybrid system. This analysis found that the vast majority of solar energy fluctuations are small in magnitude and the worst case energy fluctuation can be accommodated by relatively inexpensive and simple storage with conventional lead-acid batteries. For systems where the PV power rating is identical to the CHP unit, the CHP unit must run for more than twenty hours a day for the system to meet the base load requirement during the winter months. This provides a fortunate supply of heat, which can be used for the needed home heating. This paper provides analysis for a preliminary base line system.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.359
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.036
GPT teacher head0.226
Teacher spread0.190 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Quick stats

Citations31
Published2009
Admission routes2
Has abstractyes

Explore more

Same topicSolar Thermal and Photovoltaic SystemsFrench-language works237,207