MétaCan
Menu
Back to cohort

Establishing Business Collaboration between Contractors and Developers Based on Management Information System

2009· article· en· W2148493650 on OpenAlexvenueno aff
Cheng Jing, Xiaohui Li

Bibliographic record

VenueCanadian social science · 2009
Typearticle
Languageen
FieldBusiness, Management and Accounting
TopicBusiness Process Modeling and Analysis
Canadian institutionsnot available
Fundersnot available
KeywordsCompetence (human resources)Information systemBusinessThe InternetKnowledge managementPolitical scienceBusiness administrationManagementHumanitiesComputer scienceEconomicsWorld Wide WebPhilosophy

Abstract

fetched live from OpenAlex

The relationship between developers and contractors can change to a strategic business collaboration based on Management Information System (MIS). The purpose of this paper is to show how to establish this strategic collaboration through an efficient information circulating mode based on MIS. The paper interprets the extent and the importance of information in projects, and puts forward a collaboration mode of information circulating. This mode is feasible taking into consideration both the technological and economic aspects. The strategic business collaboration could help contractors and developers reduce project costs and increase competence. As a result of the study, the conceptual model of the collaboration mode through Internet and MIS is presented. Key words: business collaboration, construction industry, Management Information System (MIS) Resume: La relation entre les exploitants et entrepreneurs peut se changer en collaboration commerciale strategique basee sur le Systeme d’Information de Management( SIM). Cet essai vise a demontrer comment etablir cette collaboration strategique par un mode de circulation efficace des informations fonde sur le SIM. L’article interprere l’ampleur et l’importance des informations dans les projets, et met en avance un mode de collaboration de la circulation des informations. Prenant en consideration les aspects technologique et economique, ce mode est faisable. La collaboration commerciale strategique pourrait aider les entrepreneurs et exploitants a reduire le cout du projet et elever la competence. Comme le resultat de l’etude, le modele de conception du mode de collaboration par Internet et SIM est presente. Mots-Cles: collaboration commerciale, industrie de construction, Systeme d’Information de Management (SIM)

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesScholarly communication
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.670
Threshold uncertainty score0.999

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.004
Science and technology studies0.0010.000
Scholarly communication0.0020.004
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.205
Teacher spread0.195 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2009
Admission routes1
Has abstractyes

Explore more

Same venueCanadian social scienceSame topicBusiness Process Modeling and AnalysisFrench-language works237,207