Study on the Whole Process Risk Management System of Power Grid Construction Projects
Bibliographic record
Abstract
With the rapid development of economy in China, the importance of power grid construction projects is increasingly highlighted and the environment and risks encountered by power grid construction projects also become more and more complicated. In order to ensure that perfect social and economy benefits of power grid construction projects are realized, it is necessary to practically enhance the risk management level of power grid construction projects. Based on an overall analysis of the features of objectivity, uncertainty and change of risks in power grid construction projects, this article begins with the whole process of project construction, conducts a systematic study on the whole process risk management system of power grid construction projects from the three perspectives of whole process risk identification of power grid construction projects, whole process risk evaluation of power grid construction projects and whole process risk management measures of power grid construction projects and provides reference for management personnel of power grid construction projects in enhancing their risk management level.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.004 | 0.008 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.001 |
| Bibliometrics | 0.003 | 0.002 |
| Science and technology studies | 0.001 | 0.001 |
| Scholarly communication | 0.002 | 0.003 |
| Open science | 0.001 | 0.002 |
| Research integrity | 0.001 | 0.001 |
| Insufficient payload (model declined to judge) | 0.001 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".