MétaCan
Menu
Back to cohort
Record W2159096491 · doi:10.5539/mas.v2n6p41

Effective Resources Management in Construction Industries for Success

2008· article· en· W2159096491 on OpenAlexvenueno aff
Jayakumar Muthuramalingam

Bibliographic record

VenueModern Applied Science · 2008
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsScope (computer science)BusinessProfit (economics)ProductivityControl (management)Quality (philosophy)Product (mathematics)Environmental economicsProcess (computing)Operations managementComputer scienceEconomicsEconomic growth

Abstract

fetched live from OpenAlex

In most of the cases, the only poor planning and control of resources makes the projects plunge into crises. The ultimate aim of success or profit of the projects is achieved the objectives of specified performance of scope with in the stipulated time by utilizing minimum resources. Today’s open market demands not only cheaper products and services but also better product and services. Increased pressures to reduce the cost have not only led to the migrations of U.S. manufacturing operations to Mexico and Far East but also Singapore and Malaysian manufactures into China and other Asian Countries. The process-based project management system controlled by the quality standards may be viable solutions for the success. In construction sector, rather than adopting the optimum design procedures, the effective construction methodology and planning will result in significant savings in resources. This paper describes the line of balancing techniques to minimize the quantity and maximize the productivity of human resources. The effective utilization of resources by establishing average demand over the maximum project periods by resources smoothening techniques are outlined in this paper.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.828
Threshold uncertainty score0.305

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.010
GPT teacher head0.210
Teacher spread0.199 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations4
Published2008
Admission routes1
Has abstractyes

Explore more

Same venueModern Applied ScienceSame topicBIM and Construction IntegrationFrench-language works237,207