Study on Large Power Grid Construction Projects Whole Process Cost Management Modes
Why this work is in the frame
A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.
Bibliographic record
Abstract
Cost management is an important part of power grid construction project management, reasonable cost management should start from project decision-making stage and end at completion acceptance stage, namely whole process management. This paper expounds the connotation of whole process cost management, at the same time, puts forward proposed plans as to its application in large power grid construction projects, and makes interpretation about meanings of power grid construction projects whole process cost management.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.002 |
| Science and technology studies | 0.001 | 0.000 |
| Scholarly communication | 0.000 | 0.002 |
| Open science | 0.001 | 0.001 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it