MétaCan
Menu
Back to cohort
Record W2159188393 · doi:10.5539/ass.v8n11p54

Study on Large Power Grid Construction Projects Whole Process Cost Management Modes

2012· article· en· W2159188393 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

venuePublished in a venue whose home country is Canada.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueAsian Social Science · 2012
Typearticle
Languageen
FieldComputer Science
TopicAdvanced Decision-Making Techniques
Canadian institutionsnot available
Fundersnot available
KeywordsConnotationProcess (computing)GridPower gridComputer scienceProcess managementPower (physics)Operations managementRisk analysis (engineering)BusinessEngineeringMathematics

Abstract

fetched live from OpenAlex

Cost management is an important part of power grid construction project management, reasonable cost management should start from project decision-making stage and end at completion acceptance stage, namely whole process management. This paper expounds the connotation of whole process cost management, at the same time, puts forward proposed plans as to its application in large power grid construction projects, and makes interpretation about meanings of power grid construction projects whole process cost management.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.909
Threshold uncertainty score0.687

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.002
Science and technology studies0.0010.000
Scholarly communication0.0000.002
Open science0.0010.001
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.027
GPT teacher head0.358
Teacher spread0.331 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it