MétaCan
Menu
Back to cohort
Record W2166111345 · doi:10.12821/ijispm010301

Project characteristics, project management software utilization and project performance: An impact analysis based on real project data

2022· article· en· W2166111345 on OpenAlexafffund
Robert Pellerin, Nathalie Perrier, Xavier Guillot, Pierre‐Majorique Léger

Bibliographic record

VenueInternational journal of information systems and project management · 2022
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsHEC MontréalPolytechnique Montréal
FundersNatural Sciences and Engineering Research Council of Canada
KeywordsSoftware project managementProject management triangleProject managementProject planningExtreme project managementProject managerComputer scienceWork breakdown structureProject portfolio managementEarned value managementSoftwareEngineering managementSystems engineeringOPM3Process managementSoftware engineeringSoftware developmentEngineeringSoftware constructionOperating system

Abstract

fetched live from OpenAlex

Project management software packages are increasingly used by companies. These tools require a substantial financial investment, hence the importance of identifying the real contribution of project management software packages to the realization of projects. However, studies on the impacts of software packages on the performance of engineering project management are rare and mostly based on perceptions. The objective of this study is to investigate, from real project data, the level of utilization of a project management software package, developed by an engineering construction firm recognized internationally, and its link with project performance and project characteristics. Results stemming from non-parametric tests and correlation analyses show that the level of use of the software, and some of its subsystems, appears to be linked to project performance. Project duration also seems to be the most critical project characteristic.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.008
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Scholarly communication
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.815
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0080.000
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0090.003
Science and technology studies0.0010.000
Scholarly communication0.0020.005
Open science0.0020.001
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.144
GPT teacher head0.416
Teacher spread0.272 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations12
Published2022
Admission routes2
Has abstractyes

Explore more

Same venueInternational journal of information systems and project managementSame topicConstruction Project Management and PerformanceFrench-language works237,207