MétaCan
Menu
Back to cohort
Record W2174451207

Progress on the International Space Station - We're Part Way up the Mountain

2001· article· en· W2174451207 on OpenAlexaboutno aff
Lindy Fortenberry, John-David F. Bartoe, T. W. Holloway

Bibliographic record

VenueNASA STI Repository (National Aeronautics and Space Administration) · 2001
Typearticle
Languageen
FieldPhysics and Astronomy
TopicPlanetary Science and Exploration
Canadian institutionsnot available
Fundersnot available
KeywordsPeacetimeInternational Space StationCrewDestiny (ISS module)Space (punctuation)AeronauticsCountdownScheduleEngineeringTelecommunicationsOperations managementOperations researchPolitical scienceComputer scienceAerospace engineeringLaw
DOInot available

Abstract

fetched live from OpenAlex

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.853
Threshold uncertainty score0.592

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0010.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.025
GPT teacher head0.261
Teacher spread0.236 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2001
Admission routes1
Has abstractyes

Explore more

Same venueNASA STI Repository (National Aeronautics and Space Administration)Same topicPlanetary Science and ExplorationFrench-language works237,207