MétaCan
Menu
Back to cohort
Record W2175616469 · doi:10.3390/buildings5041265

Evaluating the Alignment of Organizational and Project Contexts for BIM Adoption: A Case Study of a Large Owner Organization

2015· article· en· W2175616469 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueBuildings · 2015
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of British Columbia
Fundersnot available
KeywordsBuilding information modelingKnowledge managementProcess managementFacility managementWork (physics)Information exchangeOrganizational structureOrder (exchange)Computer scienceBusinessEngineeringOperations managementMarketing

Abstract

fetched live from OpenAlex

Building information modeling (BIM) has been presented as a potential solution to current facilities management problems related to information exchange during handover, and facilities information management during operations. However, implementing BIM in an owner organization is a complex challenge that necessitates reconfiguration of work practices and internal structures to fully realize the benefits. Owners are often unsure about how or whether they should go through the challenges related to implementation. Although previous studies have documented the potential benefits of BIM adoption for owners, such as improvements in work order processing, very little research has specifically looked at the transition to BIM and the scale of the effort required for large and diverse owner organizations. This paper presents the results of a long-term embedded case study analysis of a large owner-operator institutional organization that investigated the alignment of facility management (FM) practices across organizational and project contexts. The research objective was to examine current organizational practices in order to understand the potential, as well as the challenges, of transitioning from a paper-based to a model-based approach in handover and operations. We describe the current state of handover, information management and facility management practices and developed a framework to characterize the alignment between organizational constructs, available technology, project artifacts and owner requirements. This investigation of the current state of practice enables us to understand the gap between available and required information, processes and technology, and to better understand the enormous challenges owners face when considering the transition to BIM.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Qualitative · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.380
Threshold uncertainty score0.162

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.040
GPT teacher head0.314
Teacher spread0.273 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it