Supply chain cost model for prefabricated building material based on time-driven activity-based costing
Bibliographic record
Abstract
The effect of ‘supply chain management’ can be leveraged when benefits of collaboration within and beyond the capacities of individual organizations are witnessed. One of the primary tasks in reducing total supply chain costs is to understand where the costs occur in a supply chain and how each activity impacts the total supply chain costs. Most supply chains in construction usually involve multiple entities, each one in a different process. A rebar supply chain is one example where many entities are involved in different processes. The supply chain coordinator needs a supply chain cost model, which shows how each activity impacts all supply chain costs to reduce the total costs. The research suggests a supply chain cost model using time-driven activity-based costing. The proposed cost model was applied to a building construction project, followed by sensitivity analysis identifying critical activities. This method can be adapted to analyze other fragmented material supply chains in the construction industry.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.002 | 0.003 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.001 | 0.002 |
| Bibliometrics | 0.002 | 0.002 |
| Science and technology studies | 0.001 | 0.001 |
| Scholarly communication | 0.002 | 0.002 |
| Open science | 0.002 | 0.001 |
| Research integrity | 0.002 | 0.002 |
| Insufficient payload (model declined to judge) | 0.008 | 0.001 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".