MétaCan
Menu
Back to cohort
Record W2264656926 · doi:10.2172/814128

Review of the Structure of Bulk Power Markets Grid of the Future White Paper

2000· report· en· W2264656926 on OpenAlexaboutno aff
Brendan Kirby

Bibliographic record

Venuenot available
Typereport
Languageen
FieldEngineering
TopicElectric Power System Optimization
Canadian institutionsnot available
Fundersnot available
KeywordsRestructuringCompetition (biology)Transmission (telecommunications)Industrial organizationBusinessIncentiveElectricity marketWhite paperRulemakingPower transmissionCommissionTelecommunicationsElectricityComputer scienceEconomicsFinancePower (physics)EngineeringMicroeconomics

Abstract

fetched live from OpenAlex

This paper is intended to provide an understanding of the needs of a restructured electricity market and some of the market methods and systems that have developed to address those needs. Chapter 2 discusses the historic market framework of vertically integrated utilities. Chapter 3 introduces the changes to the vertically integrated utility brought about by restructuring. It discusses generation and transmission planning, control and the regulatory process. It also summarizes reliability, security and adequacy. Chapter 4 discusses the basic structures of generation and transmission markets along with transmission-congestion contracts (TCCs) and transmission pricing principles. A discussion is given of the 12 ancillary services needed to reliably operate the power system. Chapter 4 also deals with the role of transmission in opening up markets to competition. In California increments (incs) and decrements (decs) are bid to overcome price differences in different zones caused by congestion. In PJM, any member can purchase Fixed Transmission Rights (FTRs) which allows the member to ''collect rent'' on congested lines and essentially obtain a hedge against congestion. There has been a worrisome slowdown in the growth of the transmission system in the United States since about the mid 70's. However, there are methods for providing incentives for construction of new transmission using tariffs. The California and PJM transmission planning processes are outlined. The Federal Energy Regulatory Commission (FERC) has recently issued a proposed rulemaking on Regional Transmission Organizations (RTOs) which stated that the traditional methods of grid management are showing signs of strain and may be inadequate to support efficient and reliable transmission operations. Chapter 5 provides examples of market implementations and a discussion of the price spikes seen in the Midwest in the summers of 1998 and 1999. An examination of six restructured market systems is performed in some detail. The systems are California, PJM (Pennsylvania, New Jersey, Maryland), New England, United Kingdom (UK), Alberta, and Australia. Finally, there is a discussion of the price spikes that occurred in the Midwest this summer from the viewpoint of market performance. Chapter 6 deals with the concept of load as a resource. This is a novel idea that holds tremendous promise as technological advances permit real time control of loads based on the user's economic criteria. The user may be willing to curtail operations for some period of time when the spot price reaches a certain level, or the user may be willing to sell ancillary services to the system. Chapter 7 outlines the research needs presented by a restructured industry and the vital federal role in meeting these needs. Without federal participation, research to advance the public good will not be performed by an industry now focused on profit. Chapter 8 provides a summary and concluding remarks.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesInsufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Review · Consensus signal: none
Teacher disagreement score0.511
Threshold uncertainty score0.998

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.003
GPT teacher head0.197
Teacher spread0.194 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designNot applicable
Domainnot available
GenreReview

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2000
Admission routes1
Has abstractyes

Explore more

Same topicElectric Power System OptimizationFrench-language works237,207