MétaCan
Menu
Back to cohort
Record W2267873388

Colesburg under construction : feature : infrastructure

2013· article· en· W2267873388 on OpenAlexaboutno aff
Chantelle Van Schalkwyk

Bibliographic record

VenueWater&Sanitation Africa · 2013
Typearticle
Languageen
FieldBusiness, Management and Accounting
TopicPublic-Private Partnership Projects
Canadian institutionsnot available
Fundersnot available
KeywordsQuarter (Canadian coin)Feature (linguistics)Water supplyBusinessWater infrastructureCritical infrastructureEnvironmental planningComputer scienceEngineeringEnvironmental scienceGeographyComputer securityEnvironmental engineering
DOInot available

Abstract

fetched live from OpenAlex

The overall progress of the Umsobomvu Local Municipality Bulk Water Supply Scheme reached 77% in March this year and completion is still expected in the second quarter of 2014, according to Lerato Mokoena, programme manager: Regional Bulk Infrastructure Programme at the DWA.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesInsufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.406
Threshold uncertainty score0.847

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0020.000
Scholarly communication0.0020.001
Open science0.0000.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.4060.074

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.016
GPT teacher head0.210
Teacher spread0.194 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2013
Admission routes1
Has abstractyes

Explore more

Same venueWater&Sanitation AfricaSame topicPublic-Private Partnership ProjectsFrench-language works237,207