MétaCan
Menu
Back to cohort
Record W2276374701 · doi:10.14288/1.0076120

Risk management of multi-state multi-component bridge systems using partially observable Markov decision processes

2015· article· en· W2276374701 on OpenAlexaff
Abdollah Shafieezadeh, Ehsan Fereshtehnejad

Bibliographic record

VenuecIRcle (University of British Columbia) · 2015
Typearticle
Languageen
FieldDecision Sciences
TopicRisk and Safety Analysis
Canadian institutionsUniversity of British Columbia
Fundersnot available
KeywordsComponent (thermodynamics)ObservableComputer scienceMarkov processState (computer science)Markov chainPartially observable Markov decision processEconometricsRisk analysis (engineering)MathematicsMarkov modelStatisticsBusinessAlgorithmMachine learning

Abstract

fetched live from OpenAlex

Infrastructure systems play a critical role in providing continuous services to societies. Exposure to stressors such as aging, demand loads, and environmental factors threatens the functionality and safety of infrastructure systems, highlighting the necessity for proper decision-making frameworks. Toward this goal, in the light of imperfect asset condition state evaluation, this paper presents a stochastic framework based on partially observable Markov decision process (POMDP) for the determination of optimal maintenance actions. A feature of this approach is its ability to effectively and accurately manage large scale, multi-state multi-component bridge systems. To overcome the dimensionality curse of the decision-making for such large systems without losing accuracy, the “counting process” state reduction technique is applied and conformed in a novel way. Further, to significantly reduce the computational runtime while keeping the accuracy in a high level, a randomized point-based value iteration POMDP is utilized. The proposed framework is applied to a case study bridge system with four steel girders and one concrete deck. Results of 12 random runs showed acceptable convergence in the optimized average expected long-run reward. The applied framework provides optimal policies for the concrete deck and girders in each of the possible states. It is also concluded that the combination of the POMDP decision-making framework and the “counting process” technique gives rise to an efficient and accurate approach for the optimal management of large scale systems.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.005
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.011
Threshold uncertainty score0.023

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.005
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.000
Science and technology studies0.0010.001
Scholarly communication0.0020.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.099
GPT teacher head0.286
Teacher spread0.187 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2015
Admission routes1
Has abstractyes

Explore more

Same venuecIRcle (University of British Columbia)Same topicRisk and Safety AnalysisFrench-language works237,207