Developing Robust Project Scheduling Methods for Uncertain Parameters
Bibliographic record
Abstract
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against possible disruptions that may occur during project execution. In order to apply robust scheduling principles to real projects, one should make assumptions close to the actual conditions of the project as much as possible. In this paper, in terms of uncertainty in both activities duration and resources availability, some methods are proposed to construct the robust schedules. In addition, various numerical experiments are applied to different problem types with the aid of simulation. The main purpose of those is to assess the performance of robust scheduling methods under different conditions. Finally, we formulate recommendations regarding the best method of robust scheduling based on the results of these experiments.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.003 | 0.010 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.001 | 0.001 |
| Bibliometrics | 0.001 | 0.001 |
| Science and technology studies | 0.000 | 0.001 |
| Scholarly communication | 0.001 | 0.001 |
| Open science | 0.001 | 0.001 |
| Research integrity | 0.001 | 0.002 |
| Insufficient payload (model declined to judge) | 0.002 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".