MétaCan
Menu
Back to cohort
Record W2326912395 · doi:10.2118/174993-ms

A Probabilistic Economic Approach to Optimize Field Development and Maximize Asset Value

2015· article· en· W2326912395 on OpenAlexaff
V. A. Huerta, J. Wilson Aliaga

Bibliographic record

VenueSPE Annual Technical Conference and Exhibition · 2015
Typearticle
Languageen
FieldEngineering
TopicReservoir Engineering and Simulation Methods
Canadian institutionsSt. Peter's Hospital
FundersLouis and Harold Price Foundation
KeywordsProfitability indexProbabilistic logicComputer scienceOperating expenseDiscounted cash flowCash flowProduction (economics)Present valueNet present valueAsset (computer security)Monte Carlo methodEconometricsMathematical optimizationEconomicsMathematicsStatisticsAccounting

Abstract

fetched live from OpenAlex

Abstract Field development optimization is one of the most important and complex tasks in the petroleum industry since technical and economic issues should be considered to maximize an asset value. Usually field development plans are optimized first, under a deterministic or probabilistic approach, by numerical simulation or other engineering tools, and then, a base case model served for economic assessment, with some sensitivity analysis. Complexity in field development optimization is based on uncertainty sources which often arise at the same time, such as strong correlation among oil prices and technical recoverable volumes, development wells, CAPEX and OPEX. Then, uncertainty and dependency between model inputs are not easy to be modeled by conventional tools. A new probabilistic tool has been proposed to integrate technical recoverable volumes estimation, production performance prediction and economic assessment. Hydrocarbon recoverable volumes are estimated using a volumetric equation set up to run Monte Carlo simulation; thousands of realizations are then captured by the model to build an expectation curve. In addition, type curves from analogous fields and conceptual simulation studies are incorporated to obtain the probabilistic distribution of the parameters that will allow us to predict the production performance of a field under a stochastic approach. Finally, all the output production profiles are integrated to a probabilistic cash flow model based on real options, to assess at the same time, the uncertainty placed on oil & gas prices, CAPEX, OPEX, tax royalties and other economic inputs over profitability indicators such as NPV, IRR, pay out and investment/profitability rate. The use of real options will allow us to quantify the value of important flexibilities normally neglected in a typical cash flow analysis such as the value of waiting to develop the lease, the possibility of early development, and the abandonment of the project. To achieve this objective, we will use computational techniques such as finite difference and Monte Carlo simulations considering two price models for oil and gas: Geometric Brownian Motion and Mean Reverting Model. The model was applied to a remote Peruvian oilfield suspected to be under water drive mechanism to optimize its development strategy in early times, by finding the most suitable number of development wells according to field size, and selecting the optimal production rates, increasing recovery factor and delaying water breakthrough, variables that eventually would contribute with maximizing asset value. In addition, the model was capable to test and identify simultaneously the most sensitive inputs affecting recoverable volumes and asset value, as well as, to account for the risk expressed in expectation curves of technical recoverable volumes, as well as, the expected monetary value.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.425
Threshold uncertainty score0.511

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.044
GPT teacher head0.276
Teacher spread0.232 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations5
Published2015
Admission routes1
Has abstractyes

Explore more

Same venueSPE Annual Technical Conference and ExhibitionSame topicReservoir Engineering and Simulation MethodsFrench-language works237,207