7th Street SW Cycle Track: Calgary's First Centre City Cycle Track
Bibliographic record
Abstract
The City of Calgary opened its first physically separated cycle track in the Centre City in July 2013 along 7th Street SW between 1st Avenue and 8th Avenue. This cycle track connects many businesses, residences and office towers in west downtown to the popular Bow River Pathway, Peace Bridge and the LRT station along 7th Avenue SW. With the approval of the Calgary Transportation Plan (CTP) in 2009, a shift from the “status quo†approach to city building was witnessed as there was an increasing focus on providing transportation choices, especially those that promote sustainability, health and the environment. One way The City of Calgary is achieving the goals of this plan is through the Cycling Strategy, which was approved by Council on July 2011. The 7th Street SW cycle track project accomplished a major milestone towards building the proposed ‘Centre City Cycle Track Network’ as identified in the ‘Cycling Strategy’. The City reviewed different design options with a number of internal and external stakeholders before proceeding with the two-way cycle track on 7th Street SW. As this was the first cycle track in the Centre City, the project team faced an enormous challenge right from the inception of this project which continues to date. However, with proper planning and design, timely consultation with stakeholders, advocacy groups & community associations the project team was able to demonstrate the value of this sustainable initiative. The considerable constraints including tight timelines, fierce opposition by business owners for potential loss of parking, access/safety issues, operational/winter maintenance concerns etc. were overcome by providing design options, public engagement, timely project delivery, innovative educational and promotional tools and support from the City Council. The post opening increase in the number of cyclists speaks to the evident popularity of this infrastructure. A number of innovations were witnessed in this project to address time constraints, operational issues, parking issues, safety of vulnerable road users, accessibility and beautification of the corridor. This project demonstrated the importance of timely engagement of the stakeholders. Buy-in from users was evident as the number of bicyclists almost quadrupled within a few months after opening. This project provided a test bed to demonstrate the opportunities of the cycle track and challenges associated with the winter maintenance that can be applied to other jurisdictions in Canada. It is an inspiration to the future cycle track network as it provided a successful example of how cycle tracks can be implemented in constrained downtown environment. In addition to the dialogue with the stakeholders, a pro-active approach to the media was one of the key factors behind the success of this cycle track. This submission provides further details of the 7th Street SW Cycle Track Project, for the nomination in the Sustainable Urban Transportation Award category.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.002 | 0.001 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.001 | 0.000 |
| Bibliometrics | 0.000 | 0.001 |
| Science and technology studies | 0.001 | 0.000 |
| Scholarly communication | 0.000 | 0.001 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.001 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".