MétaCan
Menu
Back to cohort
Record W2371988171

Appendix 1: The Electricity Market

2008· article· en· W2371988171 on OpenAlexaboutno aff
Wholesale Market Operations

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicPower System Reliability and Maintenance
Canadian institutionsnot available
Fundersnot available
KeywordsElectricityGeographyEngineeringElectrical engineering
DOInot available

Abstract

fetched live from OpenAlex

Electricity customers in Texas are served by three distinct electric networks defi ned by specifi c geographic boundaries, each of which have unique rules that govern the operation of electricity markets within their footprint. Texas’ westernmost counties (El Paso and portions of Hudspeth and Culberson) are part of the Western electric grid of the United States and southwestern Canada. Substantial land areas in the Texas Panhandle as well as contiguous areas in East Texas from Texarkana to Beaumont are part of the Eastern electric grid of the United States. Th e remainder of Texas is contained within the Electric Reliability Council of Texas (ERCOT), representing approximately 75 percent of the land area and 85 percent of the electric consumption in the state. Th is appendix describes key features of the electricity market in ERCOT.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.903
Threshold uncertainty score0.587

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.176
Teacher spread0.168 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2008
Admission routes1
Has abstractyes

Explore more

Same topicPower System Reliability and MaintenanceFrench-language works237,207