The study on termination decision of group projects of enterprise technical innovation
Bibliographic record
Abstract
It is of a very important Theoretical and practical significance to identify and terminate those futureless technical innovation projects for long-term technical innovation ability and competitive advantage of these enterprises. In this paper, on the foundation of the principle analysis of technical innovation projects termination decision, a mathematical model of four-stages is proposed, which can assist the manager of technical innovation group projects to realize technical innovation projects portfolio optimization and decide how many projects should be terminated before entering next stage. Then the Risk Evaluation Matter-element Model for Enterprise Technology Innovation is applied to decide these projects that should be terminated. The study not only overcome the difficulties and draw backs in the existing method of technical innovation projects termination decision, but also provide a new theoretical basis for following management of technical innovation projects. At the end of this paper, the feasibility and validity of this method are testified by the actual problem.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".