MétaCan
Menu
Back to cohort
Record W2376597374

Meditations about the blackouts in USA and Canada and countermeasures adopted by Shanghai Electric Power

2003· article· en· W2376597374 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

aboutThe title or abstract carries a Canadian signal from the geographic lexicon.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueShanghai Electric Power · 2003
Typearticle
Languageen
FieldEngineering
TopicSmart Grid and Power Systems
Canadian institutionsnot available
Fundersnot available
KeywordsGovernment (linguistics)Work (physics)Electric powerBusinessElectric power industryElectricityGridSmart gridElectric power systemPower (physics)Computer securityEngineeringComputer scienceElectrical engineering
DOInot available

Abstract

fetched live from OpenAlex

The blackouts happening successively in USA, Canada and Italy in Aug. and Sept. of 2003 have been taken into consideration and analyzed together with the problem of the power supply safety of Shanghai and also the risks inherent in our work of gird planning, construction, dispatch, information safety and coordination management. Arrangements and countermeasures have been suggested to ensure the safety of the Shanghai Grid. It was also pointed out that after the reform of the electric power system Shanghai Electric Power Company as an enterprise should depend upon the government in the field of electric power planning, construction and operation management. The government should play an active and leading role in these fields. The grid construction must be treated as the major part of the city infrastructure construction and the respective responsibility entity should be identified in legal form. The grid structure should he improved incessantly by strengthening the local supporting power sources, controlling the electricity import ratio adequately, consolidating the unified dispatch of the power grid, improving the consumer side management and enhancing the riskresisting capability of the grid with great efforts. The emergency fault handling and control system should be introduced or established and at the same thne the enterprise information and date safety should be emphasized. Under the new situation the sense of responsibility as a power company will be strengthened and the company with the help of the relevant sectors will make great efforts to build a modern urban power grid, meeting the needs of an international metropolis.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.165
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.005
GPT teacher head0.189
Teacher spread0.184 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it