MétaCan
Menu
Back to cohort
Record W2400556013 · doi:10.69554/sqwn3234

Integrating an incident management system within a continuity of operations programme/ Case study of the Bank of Canada

2013· article· en· W2400556013 on OpenAlexaffabout
Carole Loop

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldBusiness, Management and Accounting
TopicSupply Chain Resilience and Risk Management
Canadian institutionsBank of Canada
Fundersnot available
KeywordsIncident responseBusiness continuityHierarchyPlan (archaeology)Operating modelProcess managementIncident managementBusinessOperations managementComputer scienceEngineering managementKnowledge managementComputer securityEngineeringMarketingPolitical science

Abstract

fetched live from OpenAlex

Carrying out critical business functions without interruption requires a resilient and robust business continuity framework. By embedding an industry-standard incident management system within its business continuity structure, the Bank of Canada strengthened its response plan by enabling timely response to incidents while maintaining a strong focus on business continuity. A total programme approach, integrating the two disciplines, provided for enhanced recovery capabilities. While the value of an effective and efficient response organisation is clear, as demonstrated by emergency events around the world, incident response structures based on normal operating hierarchy can experience unique challenges. The internationally-recognised Incident Command System (ICS) model addresses these issues and reflects the five primary incident management functions, each contributing to the overall strength and effectiveness of the response organisation. The paper focuses on the Bank of Canada's successful implementation of the ICS model as its incident management and continuity of operations programmes evolved to reflect current best practices.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.003
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Qualitative · Consensus signal: Qualitative
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.935
Threshold uncertainty score0.473

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.003
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.004
Science and technology studies0.0140.003
Scholarly communication0.0040.001
Open science0.0020.002
Research integrity0.0010.002
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.012
GPT teacher head0.223
Teacher spread0.211 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designQualitative
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2013
Admission routes2
Has abstractyes

Explore more

Same topicSupply Chain Resilience and Risk ManagementFrench-language works237,207