Phase 1 Esquimalt Graving Dock Waterlot Remediation

2016· article· en· W2411899311 on OpenAlexaffabout
D Berlin, Tingxin Wang, M. Woltman, A. Mylly, R.G. Sharp, C. Major, Gina Cooper

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicNuclear and radioactivity studies
Canadian institutionsKlohn Crippen Berger (Canada)Government of British ColumbiaPublic Works and Government Services Canada
Fundersnot available
KeywordsDredgingRemedial actionEnvironmental remediationDOCKEnvironmental scienceContaminationEngineeringWaste managementGeologyOceanographyMarine engineering

Abstract

fetched live from OpenAlex

The Esquimalt Graving Dock (EGD) is located on federal Crown-owned property in Esquimalt Harbour on Vancouver Island, British Columbia, and is managed by the federal custodian Public Works and Government Services Canada (PWGSC). The EGD facility has been operating for the repair and maintenance of military and civilian vessels since 1927, and it is the largest solid-bottom commercial dry dock on the West Coast of the Americas. Historical contamination includes a broad range of chemicals, such as metals, polychlorinated biphenyls (PCBs), tributyltin (TBT), and polycyclic aromatic hydrocarbons (PAHs). In support of objectives of the Federal Contaminated Sites Action Plan (FCSAP), as well as a potential governance change of the EGD facility, PWGSC developed a multi-phase remedial action plan for cleaning up contaminated sediments in and adjacent to the EGD waterlot. Phase 1A was completed in 2013 and included installation of a sheetpile perimeter wall around the existing timber jetty structures to prevent re contamination of remediated sediments during subsequent phases of the project. Phase 1B was completed in March 2014 and included 144,000 cubic metres (m3) of remedial dredging and off-site upland disposal of contaminated sediments, placement of approximately 24,000 m3 of in-water slope armour, and placement of residuals management cover (RMC) over approximately 74,000 square metres. This paper discusses the key challenges encountered during the Phase 1B remedial design, contracting, and construction, including development of the dredge design, residuals management approach, accommodating highly variable operational needs into the construction sequencing approach, developing contract documents to account for local contractor experience, and specific elements that presented a challenge during construction.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.969
Threshold uncertainty score0.062

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0010.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0180.003

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.011
GPT teacher head0.229
Teacher spread0.218 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2016
Admission routes2
Has abstractyes

Explore more

Same topicNuclear and radioactivity studiesFrench-language works237,207