MétaCan
Menu
Back to cohort
Record W2414707500 · doi:10.1061/9780784479902.061

Container Wharf with an Innovative Precast Deck in a High Seismicity Area

2016· article· en· W2414707500 on OpenAlexaff
Carlos E. Ospina, Jyotirmoy Sircar, V. K. Kumar

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicMarine and Offshore Engineering Studies
Canadian institutionsBerger (Canada)
Fundersnot available
KeywordsWharfPrecast concreteDeckEngineeringInduced seismicityMarine engineeringCivil engineeringStructural engineering

Abstract

fetched live from OpenAlex

Located on the remote Aguadulce Peninsula in Buenaventura on the Pacific coast of Colombia, the Sociedad Puerto Industrial de Aguadulce (SPIA) container wharf is a T-headed pile-supported wharf comprising a 600-meter-long quay connected to a 160-meter-long access trestle and a 25-meter-long platform. The wharf is designed to support Super Post-Panamax ship-to-shore cranes and berth 12,500-TEU container vessels. The marine contractor chose to build the wharf with a top-down construction system to expedite construction. The benefits of this system were maximized by the implementation of a deck system composed primarily of precast concrete (PC) elements over high-capacity driven steel pipe piles. The deck system involved the use of an innovative PC plug providing the connection between the pipe piles and the PC deck elements. The PC plugs had to not only provide structural performance equivalent to the widely accepted cast-in-place concrete plugs, but also had to be optimized for transportation and erection. This paper describes how the different PC elements forming the wharf deck system were designed, detailed, erected, and connected. The paper also presents key results of the seismic analyses and design. The design of the deck was particularly challenging because of the need to implement seismic capacity protection principles in one of the world’s highest seismic areas. The paper also elaborates on how the top-down construction system was implemented. This system lends itself to a linear construction approach that uses previously-installed steel pipe piles as supporting elements of a platform that rapidly installs future piles and PC deck elements and then moves forward to continue with the rest of construction.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.119
Threshold uncertainty score0.375

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.185
Teacher spread0.177 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2016
Admission routes1
Has abstractyes

Explore more

Same topicMarine and Offshore Engineering StudiesFrench-language works237,207