Bibliographic record
Abstract
At the turn of the twentieth century the Russian navy was in a difficult position. Traditionally, its main theatre of operations was the Baltic Sea. By 1896, a new threat and a new potential theatre of naval operations had emerged in the Pacific. Between 1876 and 1915 roughly one-quarter of the world's land surface was annexed by the European imperialist powers and the United States. The Russian Ministry of Finance insisted that the new naval construction programme should be completed in 1905, although the rival Japanese programme was intended to reach fruition significantly earlier. As a result of the naval construction programmes, by the first years of the twentieth century Russia had moved into third place among the world's navies, with 229 ships as against Britain's 460 and France's 391. The structure and governance of the fleet and the Naval Ministry were defined by the laws of 1885 and 1888.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.001 | 0.002 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.001 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".