MétaCan
Menu
Back to cohort
Record W2597284893 · doi:10.25148/etd.fidc001262

A Comprehensive Decision Support Framework in the Front-End Phase of Major Transportation Projects

2016· dissertation· en· W2597284893 on OpenAlexaboutno aff
Nahid Vesali Mahmoud

Bibliographic record

Venuenot available
Typedissertation
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsnot available
FundersIran University of Science and TechnologyIslamic Azad UniversityFlorida International UniversityFlorida Department of Transportation
KeywordsDynamismPhase (matter)Process (computing)Front (military)Process managementDecision support systemOperations researchEngineeringManagement scienceComputer scienceRisk analysis (engineering)BusinessData mining

Abstract

fetched live from OpenAlex

Identifying the best project alternative is a critical challenge facing major transportation projects (MTPs) at the front-end phase. The increasing complexity and dynamism of MTPs have imposed substantial uncertainties and subjectivities in the decision-making process. Despite the efforts made in previous studies, a stochastic framework to facilitate the comprehensive assessment is still missing. In this research, a stochastic decision support framework has been developed to cope with the considerable uncertainties in MTPs. The features of the proposed decision support framework are achieved by using the Bayesian belief network modeling technique to provide a comprehensive registry of the relevant decision factors, establish the interrelationships between these decision factors, and consequently quantify uncertainties of decision indicators. The calculated probabilities for decision indicators have been interpreted to a satisfaction level of stakeholders based on their constraints as a multi-criteria decision model. A Monte Carlo simulation has been conducted to simulate a real condition using the decision indicators probability as input. Finally, MTP alternatives prioritized according to the anticipated satisfactory gained among various stakeholders. The created framework is used in a preliminary alternative assessment for case study related to Detroit River International Crossing project. The case study investigates the decision-making of key stakeholders related to prioritization of alternative projects for a new access between Detroit, US and Winsdor, Canada. The project team verified applicability of the model. The developed framework and the case study highlight the significance of identification of a stochastic project alternative assessment method. The proposed framework provides decision-makers with a decision support tool to facilitate front-end phase of MTPs.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesInsufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.954
Threshold uncertainty score0.993

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0080.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.080
GPT teacher head0.410
Teacher spread0.330 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2016
Admission routes1
Has abstractyes

Explore more

Same topicConstruction Project Management and PerformanceFrench-language works237,207