Fuzzy decision analysis for project scope change management
Bibliographic record
Abstract
It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project's lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incident, and thus, should be kept away from the project. By considering this concept, in this paper, we discuss scope change and managing scope and fuzzy analytical hierarchy process is used in selecting the best strategy to manage scope change in projects.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.007 | 0.010 |
| Meta-epidemiology (narrow) | 0.001 | 0.000 |
| Meta-epidemiology (broad) | 0.001 | 0.002 |
| Bibliometrics | 0.003 | 0.003 |
| Science and technology studies | 0.001 | 0.001 |
| Scholarly communication | 0.003 | 0.002 |
| Open science | 0.001 | 0.001 |
| Research integrity | 0.001 | 0.002 |
| Insufficient payload (model declined to judge) | 0.005 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".