MétaCan
Menu
Back to cohort
Record W2602074406

Measuring Work Zone Throughput and User Delays

2011· dissertation· en· W2602074406 on OpenAlexaboutno aff
Mohammad Mushtaq

Bibliographic record

VenueUWSpace (University of Waterloo) · 2011
Typedissertation
Languageen
FieldEngineering
TopicElevator Systems and Control
Canadian institutionsnot available
Fundersnot available
KeywordsThroughputWork zoneWork (physics)Computer scienceEmbedded systemReal-time computingEngineeringOperating systemMechanical engineeringWireless
DOInot available

Abstract

fetched live from OpenAlex

A larger amount of funding and attention are going toward highway infrastructure of Ontario for rehabilitation, maintenance and construction projects. These rehabilitation and maintenance activities on highways involve lane closures, which reduce the traffic throughput and cause delays for the road users. The impact of these activities is very important and has led to research into improvements of work zones in Ontario. To prevent the significant cost that these construction delays have on the general public, contractors are required to keep highway lanes open during the peak traffic hours and work at night. However, working at night may reduce the quality of the work by increasing cold joints and construction joints in the pavement, and may increase the amount of time needed to complete the work. Therefore, finding a balance between the times that the lanes can be closed and the times they should be kept open requires an accurate prediction of the construction work zone throughputs, which can increase the efficiency of the contractor work, save money and reduce the user delay costs. 
\n
\nConsequently, this study which has been funded by the Ministry of Transportation of Ontario (MTO) Highway Infrastructure Innovation Funding Program (HIIFP) involves measurement of highway construction work zones throughput of Southern Ontario, to determine the factors affecting the throughput. It has been carried out in partnership with researchers at the University of Toronto. For this study, a manual counting method for collecting throughput data has been employed. This involved data collection of variables such as heavy vehicles which had not been included in previous studies. This provides the visual confirmation of queuing and assists in evaluating the intensity of work activity at the work zones. New generic models for throughput have been developed in this research to better describe current state-of-the practice on Southern Ontario highways. Furthermore, a better functioning highway specific model was developed to calculate the throughput of the MTO Southern Ontario Highway network. In addition to development of these new models, this project involved further development and refinement to a spreadsheet based model SZUDA (Simplified work Zone User Delay Analysis) that uses normal hourly traffic flows to calculate the resulting queue for that entire hour and approximate user delay cost associated with road user delay.
\n
\nOverall, the thesis describes a methodology for collection of data in work zones. This involved collection of data during 2009 and 2010 Ontario construction season. Furthermore, the data were then used to develop more reliable generic and highway specific models for the MTO. These models can be used to determine when and how work zones should be established. Finally the refined SZUDA model and case studies demonstrate the impact of various work zone configurations on the traveling public.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Qualitative · Consensus signal: Qualitative
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.299
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.012
GPT teacher head0.158
Teacher spread0.146 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designQualitative
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2011
Admission routes1
Has abstractyes

Explore more

Same venueUWSpace (University of Waterloo)Same topicElevator Systems and ControlFrench-language works237,207