Integration of Data and Processes of AEC Projects Using the Industry Foundation Classes
Bibliographic record
Abstract
Integration trends in the Architectural, Engineering, and Construction (AEC) industry are increasing the demands for the implementation and deployment of integrated project systems. Much of the research throughout the last decade was driven by the need to develop integrated project systems and standard industry-wide data models to support their development. Standard data models are widely recognized as the main enabling technology to develop integrated AEC systems. Most notable of these models is the Industry Foundation Classes (IFC), developed by the International Alliance of Interoperability (IAI). This paper presents an implementation of the IFC classes to support the full integration of AEC projects data and processes. The paper also discusses an approach to link project design, scheduling, and cost data, and to enable bi-directional exchange of data between different systems.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.004 | 0.009 |
| Meta-epidemiology (narrow) | 0.000 | 0.001 |
| Meta-epidemiology (broad) | 0.001 | 0.001 |
| Bibliometrics | 0.003 | 0.004 |
| Science and technology studies | 0.001 | 0.001 |
| Scholarly communication | 0.006 | 0.005 |
| Open science | 0.001 | 0.003 |
| Research integrity | 0.001 | 0.002 |
| Insufficient payload (model declined to judge) | 0.003 | 0.001 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".