MétaCan
Menu
Back to cohort

Application of the GeoSequencing Module to ensure optimised underground mine schedules with reduced geotechnical risk

2017· article· en· W2769200991 on OpenAlexafffund
Rebecca Hauta, Melissa Whittier, Lorrie Fava

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicMining Techniques and Economics
Canadian institutionsCentre for Excellence in Mining Innovation
FundersVale Canada Limited
KeywordsGeotechnical engineeringMining engineeringGeologyCivil engineeringEngineering

Abstract

fetched live from OpenAlex

Conventionally, engineers will impose stope sequencing rules in order to ensure the stability of excavations as mining progresses. Typical rules include fixed direction, primary-secondary and chevron. Using a mine planning software suite, a mine layout is designed, and a set of stope-to-stope precedence links are created, enforcing the applicable rule. The mine planner produces a schedule that meets these and other constraints, in an effort to achieve a high net present value (NPV) for the operation. This time-consuming process limits the planner’s ability to assess alternative mining strategies. Further, the process tends to over-constrain the mine schedule, since it is often the case that an alternative set of precedence constraints can enforce the same rule. By overconstraining the schedule, and by not assessing alternative strategies, significant value may be lost. The GeoSequencing Module is software that facilitates the assessment of stope sequencing strategies, through integration with the Schedule Optimization Tool (SOT). The GeoSequencing Module rapidly generates multiple alternative sets of stope-to-stope precedence links that enforce stope sequencing rules selected by the user. Each set of precedence links is referred to as a geosequencing scenario. For each geosequencing scenario, SOT optimises the life-of-mine schedule, allowing the planner to identify the scenario that supports the highest value for the mining operation. Furthermore, the software has been integrated with a boundary element solver, facilitating assessment of the geotechnical stability of the optimised schedules. A case study for an underground mine has been conducted to validate this methodology. The study demonstrates that multiple mining strategies can be conveniently assessed to determine which scenario yields the most desirable outcome for the mining operation in terms of both geotechnical stability and financial assessment.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.138
Threshold uncertainty score0.282

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.221
Teacher spread0.208 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2017
Admission routes2
Has abstractyes

Explore more

Same topicMining Techniques and EconomicsFrench-language works237,207