MétaCan
Menu
Back to cohort
Record W2776706707

Connecting values, process, and project design: twinning the Trans-Canada Highway in Banff National Park in Canada - eScholarship

2005· article· en· W2776706707 on OpenAlexaboutno aff
Terry McGuire, Sheila Luey

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldSocial Sciences
TopicCross-Border Cooperation and Integration
Canadian institutionsnot available
Fundersnot available
KeywordsNational parkMandateGeographyTourismAgency (philosophy)Environmental resource managementEnvironmental protectionEnvironmental planningPolitical scienceArchaeologyLawSociology
DOInot available

Abstract

fetched live from OpenAlex

Extending from coast to coast, the Trans-Canada Highway (TCH) plays an integral role in Canada’s social and economic wellbeing. For geographic and historical reasons, 83 of its 7,500 kilometers bisect Banff National Park, Canada’s first and most popular park. Part of the UNESCO Canadian Rocky Mountains World Heritage Site and known worldwide for this park’s spectacular landscapes and exceptional natural resources, Banff has long been considered a harbinger for the future of other parks and protected areas across the country. Parks Canada is the federal agency responsible for managing national parks in Canada. Under its mandate, Parks Canada must preserve and protect the ecological integrity of national parks for future generations while fostering public use and appreciation of these areas. And while not truly part of the mandate, major highways that run within and through federal park lands have also fallen to Parks Canada to manage. Between 1979 and 2005, in response to rising traffic volumes and public safety concerns, 43 of 83 kilometers of the Trans-Canada highway in Banff National Park were converted in phases from two to four lanes. Each of these phases sparked national public interest, the first two in particular becoming flashpoints for the many divergent views about development and conservation in protected areas. These divergent views were not limited to external stakeholders, as highway twinning was seen internally to compete with and divert limited Parks Canada’s resources away from direct mandate-related needs. Adding to the complexity of the situation is the unique governance context with Parks Canada as land manager, decision-making authority, and project proponent. This paper offers a 25-year perspective on Parks Canada’s approach to developing context-sensitive solutions; specifically use of a collaborative, interdisciplinary approach for developing a transportation facility that preserves scenic, aesthetic, and environmental resources while maintaining safety and mobility. Through four separate phases of the Trans-Canada Highway Twinning Project, this paper details how the nature and substance of public participation has changed over time and how public input can be reconciled with scientific information, project objectives, a challenging agency mandate, and engineering and financial considerations. Lessons learned in earlier phases have been applied to the most recent phase, resulting in improved stakeholder relationships and satisfaction, as well as leading-edge highway and mitigation design.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.458
Threshold uncertainty score0.995

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.039
GPT teacher head0.334
Teacher spread0.295 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2005
Admission routes1
Has abstractyes

Explore more

Same topicCross-Border Cooperation and IntegrationFrench-language works237,207