Analysis of Critical Success Factors Influence on Critical Delays for Water Infrastructure Construction Projects in the Abu Dhabi emirate Using PLS-SEM Method

2018· article· en· W2783210159 on OpenAlexvenueno aff
Jaafer Y. Altarawneh, V. Thiruchelvam, Behrang Samadi

Bibliographic record

VenueInternational Business Research · 2018
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsnot available
Fundersnot available
KeywordsStructural equation modelingCritical success factorProject managementModerationOperations managementProcess managementData collectionComputer scienceKnowledge managementBusinessEngineeringMathematicsStatisticsSystems engineering

Abstract

fetched live from OpenAlex

The objective of this study is to investigate the significance impact of critical success factors on critical delays in the field of water infrastructure construction projects (WICPs) in the Abu Dhabi emirate in particular. Investigation was conducted utilizing quantitative approach by means of questionnaire survey to examine the understanding of professionals engaged in water infrastructure construction towards several critical success factors influencing critical delays. A total of 323 completed responses from owners, consultants and contractors representatives were gathered against 450 distributed questionnaires.The gathered questionnaires were analysed using an advanced multivariate statistical method of Partial Least Square Structural Equation Modelling (PLS-SEM). Data analysis was conducted in two major phases. The first phase involved a preliminary analysis of the data, to ensure that the data adequately meet the basic assumptions in using SEM. The second phase applied the two stages of SEM. The first stage included the establishment of measurement models for the latent constructs in the research. After confirming the uni-dimensionality, reliability and validity of the constructs in the first stage, the second stage developed to test the research hypotheses through developing the structural models. The results indicated that Project Management Process (PMP), Project Manager’s Competency (PMC), Project Team’s member Competency (PTC), Project Organizational Planning (POP), Project Resources’ Utilization (PRU) and Project Organizational Commitment (POC) had significant positive effects on Critical Delay Factor Evaluation (CDFS). From the results of moderation analysis revealed that Project Benchmark Characteristics (PBC) is positively moderate the effects of Project Management Process (PMP), Project Manager’s Competency (PMC) and Project Team’s member Competency (PTC) and Project Organizational Planning (POP) on Critical Delay Factor Evaluation (CDFS).

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.005
metaresearch head score (Gemma)0.010
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMetaresearch
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.137
Threshold uncertainty score0.998

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0050.010
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0030.004
Science and technology studies0.0000.001
Scholarly communication0.0010.001
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.243
GPT teacher head0.547
Teacher spread0.304 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations9
Published2018
Admission routes1
Has abstractyes

Explore more

Same venueInternational Business ResearchSame topicConstruction Project Management and PerformanceFrench-language works237,207