Time-Dependent Transportation Network Design considering Construction Impact
Bibliographic record
Abstract
A traditional discrete network design problem (DNDP) always assumes transportation infrastructure projects to be one-time events and ignores travelers’ delays caused by construction work. In fact, infrastructure construction usually lasts for a long time, and the impact on traffic can be substantial. In this paper, we introduce time dimension into the traditional DNDP to explicitly consider the impact of road construction and adopt an overtime policy to add flexibility to construction duration. We address the problem of selecting road-widening projects in an urban network, determining the optimal link capacity, and designing the schedule of the selected projects simultaneously. A time-dependent DNDP (T-DNDP) model is developed with the objective of minimizing total weighted net user cost during the entire planning horizon. An active-set algorithm is applied to solve the model. A simple example network is first utilized to demonstrate the necessity of considering the construction process in T-DNDP and to illustrate the trade-off between the construction impact and the benefit realized through capacity extension. We also solve the T-DNDP model with data from the Sioux Falls network, which contains 24 nodes, 76 links, and 528 origin-destination (O-D) pairs. Computational results for the problem are also presented.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.001 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".