MétaCan
Menu
Back to cohort
Record W2790301752 · doi:10.1061/9780784414866.ch05

Formalizing a Construction Planning Framework to Facilitate Construction-Centric BIM Education and Practical Application

2018· book-chapter· en· W2790301752 on OpenAlexaffabout
Ming Lu

Bibliographic record

VenueAmerican Society of Civil Engineers eBooks · 2018
Typebook-chapter
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of Alberta
Fundersnot available
KeywordsBuilding information modelingComputer scienceConstruction engineeringProcess managementEngineering managementSystems engineeringKnowledge managementEngineeringOperations management

Abstract

fetched live from OpenAlex

This chapter proposes a new construction planning framework that integrates design, material, quantity, method, crew, productivity, rate, time, and cost for detailed construction planning. This framework can assist students in understanding construction projects from product-centric and process-centric perspectives and in learning how to integrate product and process to fulfill detailed construction planning needs. The proposed framework’s effectiveness in construction management education has been validated through experiments in teaching a construction planning course at the University of Alberta. The proposed construction planning framework is intended for immediate application in construction planning by training new civil engineers and guiding practicing estimators to take advantage of building information modeling (BIM) models. Most BIM models provide 3D representation of a centralized database containing design-related information of a facility. Quantity takeoff (QTO) quantities of design elements are measured based on the design drawings or 3D models.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.864
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.001
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.016
GPT teacher head0.242
Teacher spread0.225 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designNot applicable
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2018
Admission routes2
Has abstractyes

Explore more

Same venueAmerican Society of Civil Engineers eBooksSame topicBIM and Construction IntegrationFrench-language works237,207