MétaCan
Menu
Back to cohort
Record W2803673674 · doi:10.1111/mice.12370

Optimization for Roads' Construction: Selection, Prioritization, and Scheduling

2018· article· en· W2803673674 on OpenAlexaff
Saeed Asadi Bagloee, Majid Sarvi, Michael Patriksson, Mohsen Asadi

Bibliographic record

VenueComputer-Aided Civil and Infrastructure Engineering · 2018
Typearticle
Languageen
FieldEngineering
TopicInfrastructure Maintenance and Monitoring
Canadian institutionsUniversity of Saskatchewan
Fundersnot available
KeywordsGantt chartComputer scienceMathematical optimizationScheduling (production processes)Integer programmingLinear programmingChartSelection (genetic algorithm)Operations researchMachine learningEngineeringMathematicsAlgorithm

Abstract

fetched live from OpenAlex

Limited resources (budget, labor, machinery) have a significant toll on the roads' construction. The question of interest is: given variations of resources over a lengthy construction time, what would be the best construction scheduling plan, or how to optimize the Gantt chart while considering two highly challenging features (1) prerequisite conditions and (2) the interdependency of the benefit of the projects’ completions. We formulate it as a bilevel problem where the objective function is to minimize generalized costs and the lower level accounts for the drivers’ route choice. We employ a solution algorithm based on a supervised learning technique (a linear regression model of machine-learning) and an integer programming problem and it is applied to the datasets of Winnipeg and Chicago. The regression model was found to be a tight approximation which resulted in an efficient algorithm (the CPU time is almost a linear function of the number of iterations). Moreover, the proposed methodology can render promising results (at least locally optimal solutions). This article is the first to formulate the Gantt chart using linear binary constraints and optimize it tailored to real-life case studies.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.003
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.018
Threshold uncertainty score0.036

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.003
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0020.001
Bibliometrics0.0020.002
Science and technology studies0.0010.001
Scholarly communication0.0020.001
Open science0.0020.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0080.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.003
GPT teacher head0.176
Teacher spread0.174 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations26
Published2018
Admission routes1
Has abstractno

Explore more

Same venueComputer-Aided Civil and Infrastructure EngineeringSame topicInfrastructure Maintenance and MonitoringFrench-language works237,207