MétaCan
Menu
Back to cohort
Record W2804574988 · doi:10.1080/24751448.2017.1354625

Disrupting the Status Quo with Early-Stage BIM-Based Energy Modeling

2017· article· en· W2804574988 on OpenAlexaff
J.J. McArthur, Xi Ming Sun

Bibliographic record

VenueTechnology|Architecture + Design · 2017
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsToronto Metropolitan University
Fundersnot available
KeywordsSchematicBuilding information modelingStatus quoProcess (computing)Computer scienceSystems engineeringSoftwareFidelityConceptual designEngineering design processEnergy (signal processing)EngineeringSoftware engineeringHuman–computer interactionOperations managementMechanical engineering

Abstract

fetched live from OpenAlex

This paper poses the question: Is BIM-based energy simulation reliable? If so, how might this impact early-stage design? This study compares schematic buildings modeled in a BIM-based tool and in conventional building performance software, evaluates the fidelity of data transfer and calculation engine performance, and compares assumptions with conventional methods. Results show that the tested tool provides similar results to an industry-leading software; this can embolden designers to use this at conceptual design and massing stages. The ability to gain traditional engineering insight early in design provides new opportunities for designers to quantify potential energy savings much earlier in the design process than has been historically possible. Improvements in information transfer to energy modelers to streamline detailed model creation are also discussed.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.871
Threshold uncertainty score0.659

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0010.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.014
GPT teacher head0.214
Teacher spread0.200 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations5
Published2017
Admission routes1
Has abstractyes

Explore more

Same venueTechnology|Architecture + DesignSame topicBIM and Construction IntegrationFrench-language works237,207