MétaCan
Menu
← Back to cohort
Record W2808630924 · doi:10.1139/cjce-2018-0183

Automated monitoring and assessment of productivity in earthmoving projects

2018· article· en· W2808630924 on OpenAlexaffvenue
Ashraf Salem, Osama Moselhi

Bibliographic record

VenueCanadian Journal of Civil Engineering · 2018
Typearticle
Languageen
FieldEngineering
TopicInfrastructure Maintenance and Monitoring
Canadian institutionsConcordia University
Fundersnot available
KeywordsProductivityScheduleProcess (computing)EngineeringTruckSensor fusionComputer scienceOperations researchArtificial intelligence

Abstract

fetched live from OpenAlex

Continuous monitoring of productivity and assessment of its variations are crucial processes that significantly contribute to success of earthmoving projects. Numerous factors may lead to productivity variations. However, these factors are subjectively identified using manual knowledge-based expert judgment. Such manual recognition process is not only subject to errors but also time-consuming. There is a lack of research work that focuses on near real-time assessment of productivity variation and its effect on cost, schedule and effective utilization of resources in earthmoving projects. This paper presents a customized multi-source automated data acquisition model that acquires data from a variety of wireless sensing technologies. The acquired multi-sensor data are transmitted to a central MySQL database. Then a newly developed data fusion algorithm is applied for truck state recognition, and hence the duration of each earthmoving state. Multi-sensor data fusion facilitates measurement of actual productivity, and consequently the assessment of productivity ratios that support continuous monitoring of productivity variation in earthmoving operations. The developed tracking and monitoring model generates an early warning that supports proactive decisions to avoid schedule delays, cost overruns, and inefficient depletion of resources. A case study is used to reveal the applicability of the proposed model in monitoring and assessing actual productivity and its deviations from planned productivity. Finally, results are discussed and conclusions are drawn highlighting the features of the proposed model.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.005
Threshold uncertainty score0.011

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.221
Teacher spread0.213 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations7
Published2018
Admission routes2
Has abstractyes

Explore more

Same venueCanadian Journal of Civil Engineering→Same topicInfrastructure Maintenance and Monitoring→French-language works237,207→