RELATIONSHIP BETWEEN ORGANIZATIONAL FACTORS TOWARD PROJECT SUCCESS
Bibliographic record
Abstract
This paper entails the examination of the direct empirical linkage between organizational factors namely top management support, client consultation, as well as client acceptance, and the achievement of project success. Four telecommunication companies operating in Yemen were studied and they are: TeleYemen, MTN Yemen, Y Telecom, and Yemen Mobile. A total of 250 employees were the study’s participants. SEM tool and some statistical methods (i.e., the maximum likelihood estimate and regression technique) were chosen to analyze the obtained data and test the hypothesis, in order that the variable’s dimensionality could be understood. As found, organizational factors (top management support, client consultation, and client acceptance) are positively linked to the success of project. The theoretical and practical implications of this study’s findings were highlighted as well.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.001 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".