MétaCan
Menu
Back to cohort
Record W2810451685 · doi:10.1177/875697280503600403

A Retrospective look at our Evolving Understanding of Project Success

2005· article· en· W2810451685 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueProject Management Journal · 2005
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsAthabasca University
Fundersnot available
KeywordsProject management triangleProject managementProject portfolio managementExtreme project managementProject charterCritical success factorWork (physics)Process managementContext (archaeology)Project planningWork breakdown structureProject stakeholderOPM3Process (computing)Project governanceProject sponsorshipKnowledge managementEngineeringBusinessComputer scienceCorporate governanceSystems engineering

Abstract

fetched live from OpenAlex

Our views on project success have changed over the years from definitions that were limited to the implementation phase of the project life cycle to definitions that reflect an appreciation of success over the entire project and product life cycle. This paper assesses our evolving understanding of project success over the past 40 years and discusses conditions for success, critical success factors and success frameworks. The paper concludes with a holistic view of project success and its implications for practice. This is an important topic because projects are an increasingly common way of work, and the lines between project and process work are harder to discern. Increasingly, more project managers work in companies using program and portfolio management as a means to organize project-related work. The success of individual projects, therefore, impacts the wider organization in several dimensions and makes the concept of project and project management success that much more relevant. The topic is also important because it has a bearing on the future directions of project management in the strategic context.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.005
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.754
Threshold uncertainty score0.990

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0050.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.002
Science and technology studies0.0010.000
Scholarly communication0.0010.002
Open science0.0010.001
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.129
GPT teacher head0.386
Teacher spread0.257 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it