Regional economic impacts of a transportation infrastructure project: the Herb Gray Parkway
Bibliographic record
Abstract
This chapter presents estimates of total employment impacts at both the regional and national levels for the Herb Gray Parkway construction project in Windsor, Ontario, Canada. Because this study is based on detailed quarterly employment and purchasing data provided by the contractor, it generates more specific and accurate estimates than conventional input-output and other multiplier methods. The ex post estimates are contrasted with higher ex ante estimates and reasons for the gap between the two are explained. This yields insight into why anticipated employment impacts may be over-estimated and provides guidelines for more realistic impact projections. The chapter also addresses the question of what long-term regional structural transformations may arise from capital formation, skills development, technology transfer and other processes.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.000 |
| Meta-epidemiology (narrow) | 0.001 | 0.000 |
| Meta-epidemiology (broad) | 0.001 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.001 | 0.002 |
| Open science | 0.001 | 0.000 |
| Research integrity | 0.000 | 0.001 |
| Insufficient payload (model declined to judge) | 0.001 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".