Facility Operations Readiness and Project Start-Up Support and Integration

2018· article· en· W2897839187 on OpenAlexaff
Michael Forrest Maher

Bibliographic record

VenueSPE Asia Pacific Oil and Gas Conference and Exhibition · 2018
Typearticle
Languageen
FieldEngineering
TopicMarine and Offshore Engineering Studies
Canadian institutionsConocoPhillips (Canada)
Fundersnot available
KeywordsDeliverableEngineeringProject commissioningOperabilityWork (physics)Liquefied natural gasProject managementOperations managementEngineering managementSystems engineeringNatural gasPublishingWaste managementMechanical engineering

Abstract

fetched live from OpenAlex

Abstract The Australia Pacific LNG (APLNG) Downstream Project comprised construction of a two-train LNG plant, two 160,000 m3 LNG storage tanks, a LNG loading jetty, and associated infrastructure on Curtis Island, near Gladstone, Queensland. The facility utilises ConocoPhillips’ proprietary Optimized Cascade ® process to liquefy natural gas. Project planning began in 2008 and construction commenced in 2011. LNG production from Train 1 began in December 2015 and Train 2 came on line in October 2016. In August 2017, the final 90-day two-train lenders test was successfully concluded and included an operational component in which the LNG Facility operated at ten per cent above nameplate capacity for the 90-day period. This successful outcome was achieved through collaboration, integration and robust execution plans by the APLNG Operations, APLNG Project, ConocoPhillips LNG Technology and Licensing and Commissioning and Start-up work teams. In an effective strategy to support the drive to APLNG first cargo, the combined teams formed a fully Integrated Completions Team in 2015. This team worked together enabling rapid development of the operations workforce capability and resulted in both trains achieving performance tests at first attempt. The APLNG Project operability assurance and operations readiness program commenced with a collaborative workshop, attended by Operations, Projects and Commissioning and Start-up representatives. A focus on high collaboration and integration between the teams backed by ConocoPhillips’ Operability Assurance (OA) and Operations Readiness (OR) principles identified 370 critical business deliverables. Learnings were leveraged from across ConocoPhillips assets (including Darwin LNG) as they pertained to readiness best practice. APLNG Readiness Assurance guidance was established to create specific functional readiness trackers to measure every action supporting the 370 deliverables. A simple and effective tool was developed and supported by robust monthly review forums where each action was tracked and rolled up to S-Curves. These deliverables translated to over 7,000 unique line items tracked over the entirety of the readiness implementation. This work was leveraged by the Integrated Completions Team which implemented robust lessons learned from Train 1 to realize immediate results, delivering a 33% reduction in the Train 2 start-up schedule. The combined efforts of the teams delivered two highly operational trains within the 2016 calendar year resulting in the production of additional cargoes. The successful execution and implementation of OA/OR principles combined with strong integration of APLNG Operations into the APLNG Project phase laid the foundation for exceptional first year operational and production performance. This meant the APLNG Operations Team moved from a newly formed team to a high functioning and critically evolving team in support of the APLNG Downstream LNG Facility.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.950
Threshold uncertainty score0.518

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.020
GPT teacher head0.232
Teacher spread0.212 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2018
Admission routes1
Has abstractyes

Explore more

Same venueSPE Asia Pacific Oil and Gas Conference and ExhibitionSame topicMarine and Offshore Engineering StudiesFrench-language works237,207