MétaCan
Menu
Back to cohort
Record W2899214052 · doi:10.1109/tsg.2018.2878980

A Detailed Presentation of an Innovative Local and Wide-Area Special Protection Scheme to Avoid Voltage Collapse: From Proof of Concept to Grid Implementation

2018· article· en· W2899214052 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.
aboutThe title or abstract carries a Canadian signal from the geographic lexicon.

Bibliographic record

VenueIEEE Transactions on Smart Grid · 2018
Typearticle
Languageen
FieldEngineering
TopicPower System Optimization and Stability
Canadian institutionsHydro-Québec
Fundersnot available
KeywordsPhasorGridElectric power systemEngineeringControl engineeringRobustness (evolution)Reliability engineeringComputer scienceControl theory (sociology)Control (management)Power (physics)

Abstract

fetched live from OpenAlex

For more than a decade, Hydro-Québec Research Institute (IREQ) has been involved in different strategic research and development activities to maintain the stability and security of the Hydro-Québec network. An innovative project, so-called global and local control of compensators (GLCC), was initiated for wide-area and local control of dynamic shunt compensators such as static VAR compensators and synchronous condensers to increase its transfer capacity. The objective of the GLCC project is the development of a new special protection scheme (SPS) to maintain voltage stability after events resulting in large voltage drop using local and wide-area network measurements based on telecommunications and phasor measurement units. The core of the GLCC special protection scheme is the substation control unit (SCU) which includes all the intelligence of the whole GLCC control system. This paper presents the details of the functions of the SCU controller which has been designed, developed, and intensively tested by Hydro-Québec with a dedicated replica at IREQ power system simulation laboratory. Results of both hardware-in-the-loop real-time simulations and field tests showed the reliability, robustness and security of the SCU controller. On that basis, a deployment on Hydro-Québec network started to implement the GLCC SPS solution at all shunt compensator substations.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.605
Threshold uncertainty score0.710

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.018
GPT teacher head0.261
Teacher spread0.243 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it