MétaCan
Menu
Back to cohort
Record W2905493383 · doi:10.1139/cjce-2018-0305

Performance prediction of construction projects using soft computing methods

2018· article· en· W2905493383 on OpenAlexaffvenue
Seyedeh Sara Fanaei, Osama Moselhi, Sabah Alkass

Bibliographic record

VenueCanadian Journal of Civil Engineering · 2018
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsConcordia University
Fundersnot available
KeywordsPerformance indicatorArtificial neural networkComputer scienceAnalytic hierarchy processSoft computingData miningAdaptive neuro fuzzy inference systemProcess (computing)Fuzzy logicCluster analysisPerformance predictionMachine learningProject managementArtificial intelligenceEngineeringOperations researchSystems engineeringFuzzy control systemSimulation

Abstract

fetched live from OpenAlex

Key performance indicators (KPIs) evaluate different aspects of projects and are used to determine the health status of projects. While there is considerable work on project quantitative performance prediction, less attention, however, has been directed towards qualitative performance prediction. This paper offers a novel framework for qualitatively measuring and predicting six important construction project KPIs using the neuro-fuzzy technique. Neuro-fuzzy models are developed to map the KPIs of three critical project stages to whole project KPIs. Subtractive clustering is utilized to automatically generate initial fuzzy inference system (FIS) models and the artificial neural network (ANN) technique is used to tune the parameters of the initial FIS models. The relative weight of each KPI is determined using a series of computing methods namely, analytic hierarchy process (AHP) and genetic algorithm (GA), to generate the performance indicator (PI). The developed models are validated with real project data showing that the rate of error is reasonably low. The results show that the AHP method is more accurate when compared to the GA method. This framework can be used in building construction projects to help decision-makers evaluate the performance of their projects.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.006
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.012
Threshold uncertainty score0.023

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.006
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0020.002
Science and technology studies0.0000.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.079
GPT teacher head0.329
Teacher spread0.250 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations11
Published2018
Admission routes2
Has abstractyes

Explore more

Same venueCanadian Journal of Civil EngineeringSame topicConstruction Project Management and PerformanceFrench-language works237,207